Yes, I’ve bitten the bullet and it’s currently being done. Only two areas need work which are at the rear of both sills and I’ve done one side myself.

The rust proofing looks very thorough and takes a week including drying time. Trouble is the car was bone dry but I had to take it in through torrential rain so it’ll be 2-3 day drying before he starts the job


2012 Plus 4 in Sport Green. Much comfier than the Plus 8!