Things to do:

1. Re-furbish or replace front Max wheels, both have scuff marks on the rims.
2. Make new side screens in brown, to match the hood. It has black ones....
3. Make a tonneau, included in the build sheet but cannot be found.
Make and fit bonnet strap, again included in the build sheet but cannot be found.
4. Annual service, it should have been done at 12,000 miles.
5. Check and if needed re-gas the Aircon.
6. Replace the protective film on the running boards, it has been badly scuffed.
7. Fit rear rack, included in the build sheet but never fitted.
8. Check for and touch up any stone chips.

The Williams will check everything has been done to their satisfaction....

Target date is 8th November. Could be a week later.