Originally Posted by Hamwich
Originally Posted by John V6
I didn't but it was a new garage with a newly laid floor (1 year old). It was pretty level but it hadn't had any self leveling screed applied it was just poured concrete.


Same here. The concrete was poured and tamped but wasn't floated or screeded. I just swept and hoovered it and put the tiles down. It's been fine for over 5 years now so plenty of time for any issues to emerge if they were going to I think.

[Linked Image]


Ah yours looks pretty much like mine, thanks


Keith
2013 narrow bodied + 4 Ruby.