Click here to return to the home page.
Image of a road.
Who's Online Now
12 members (Montegue, AndyGoff, Rudolf, TBM, MartO, Ricosan, Alistair, Graham, G4FUJ, JMcL, Hamwich, Image, Vansrv6), 398 guests, and 83 robots.
Key: Admin, Global Mod, Mod
Top Posters(30 Days)
+8Rich 85
Newest Members
Scot_SJI, Jimmers, Breen60, Davidmog, Stevecarr
9,596 Registered Users
Newest Topics
Delay to bring up oil pressure ( 2006 +4 )
by Cerberas - 31/08/26 03:11 PM
Clarkson Review of Supersport 400
by Stephen888 - 31/08/26 01:09 PM
M3W Treffen Grindelwald 2026 /2
by Laurens - 31/08/26 01:03 PM
M3W Treffen Grindelwald 2026
by Laurens - 31/08/26 01:01 PM
Hood catches rear
by AndyGoff - 31/08/26 11:34 AM
Spare Ignition Key ............
by Pittsartist - 31/08/26 10:58 AM
Sagging Hood
by linklaw - 31/08/26 10:33 AM
Latest Photos
tow bar
tow bar
by G Walker, August 24
Prescott double anniversary
Prescott double anniversary
by CooperMan, August 18
Air Crash Sites: Cairngorms
Air Crash Sites: Cairngorms
by RedThree, August 13
Four-seater luggage rack
Four-seater luggage rack
by Soleng, August 9
New M3W orange 2012
New M3W orange 2012
by jejemek, August 7
Forum Statistics
Forums39
Topics49,859
Posts837,468
Members9,596
Most Online1,063
Jun 14th, 2026
Today's Birthdays
There are no members with birthdays on this day.
Previous Thread
Next Thread
Print Thread
Page 3 of 8 1 2 3 4 5 6 7 8
Joined: Sep 2019
Posts: 360
Likes: 36
S
Learner Plates Off!
Offline
Learner Plates Off!
S
Joined: Sep 2019
Posts: 360
Likes: 36
Originally Posted by John V6
Then he should know that if you have solar PV linked to export that when the mains is down due to a power cut it doesn't generate as it matches the phase of the network and without that signal it won't export or even power your house.

Actually if you have the PV system linked to grid which nearly all are, then any disruption to grid (voltage/frequency etc) supply will result in the PV inverter shutting down instantaneously as a safety requirement and it takes the inverter about 3 minutes to start up again once all the grid requirements are met. In the UK its classed as G98 (single phase) and G99 (3 phase) regulations.

Some of the many reason's that these huge warehouses don't get covered in Solar panels are:

1/ large roof installations are more costlier than a large ground mount to install.

2/ These warehouses normally have only a grid connection that cover the needs of the warehouse which won't be much compared to say a manufacturing facility - therefore you can only install a PV system that will not exceed the sites incoming fuse/cable capability.

3/ Legal nightmare as the occupiers of the warehouses are rarely the owners of - therefore legal consents for renting of roof space etc etc

4/ No requirement in planning to install Solar PV - idiotic but hey that's Government policy for you!

Last edited by Stevo666; 20/09/22 09:08 PM. Reason: added info
Joined: Nov 2011
Posts: 7,342
Likes: 49
Talk Morgan Guru
Offline
Talk Morgan Guru
Joined: Nov 2011
Posts: 7,342
Likes: 49
Originally Posted by Stevo666
Originally Posted by John V6
Then he should know that if you have solar PV linked to export that when the mains is down due to a power cut it doesn't generate as it matches the phase of the network and without that signal it won't export or even power your house.

Actually if you have the PV system linked to grid which nearly all are, then any disruption to grid supply will result in the PV inverter shutting down instantaneously.

Some of the many reason's that these huge warehouses don't get covered in Solar panels are:
1/ large roof installations are more costlier than a large ground mount to install.
2/ These warehouses normally have only a grid connection that cover the needs of the warehouse which won't be much compared to say a manufacturing facility - therefore you can only install a PV system that will not exceed the sites incoming fuse/cable capability.
3/ Legal nightmare as the occupiers of the warehouses are rarely the owners of - therefore legal consents for renting of roof space etc etc
4/ No requirement in planning to install Solar PV - idiotic but hey that's Government policy for you!

Interesting post, thank you....


A Morgan Identified Fastidious Owner...
2011 4/4 Bespoke, 1981 Delorean, Auburn Boat Tail
IMHO #756129 20/09/22 09:02 PM
Joined: Sep 2019
Posts: 360
Likes: 36
S
Learner Plates Off!
Offline
Learner Plates Off!
S
Joined: Sep 2019
Posts: 360
Likes: 36
IMHO - your friend could fit a 6kWp inverter with an export limiting device set at 3.68 kWp (16A) - will cost probably £300 but will solve his issue.

Don't forget that prior to installing an EV charger or a battery storage system, they will also need DNO (District Network Operator) approval beforehand especially battery storage as its classed as a generator same as PV. So if your fitting a >3.68kWp inverter and a battery storage system and an EV charger then you need 3 sets of approval.

Regarding the Solar generation getting back to grid, true in the sense it probably doesn't get back to the 400kv transmission network but it does get back to the local 11/33kv network that powers all the substations etc.

Now nearly all of my larger UKPN systems are export limited to 200 kWp - which means fit as much as you want (say 400 kWp) but your only ever allowed to export 200 kWp to the grid. (may only occur on a sunny Sunday in July when factory is shut so low consumption=high export).
Basically the grid local infrastructure can't deal with all the possible embedded generation applications that might be submitted so they are already starting to restrain the network.


Last edited by Stevo666; 20/09/22 09:09 PM. Reason: grammar
Joined: Jul 2007
Posts: 27,810
Likes: 749
Member of the Inner Circle
Offline
Member of the Inner Circle
Joined: Jul 2007
Posts: 27,810
Likes: 749
Originally Posted by Stevo666
Originally Posted by John V6
Then he should know that if you have solar PV linked to export that when the mains is down due to a power cut it doesn't generate as it matches the phase of the network and without that signal it won't export or even power your house.

Actually if you have the PV system linked to grid which nearly all are, then any disruption to grid (voltage/frequency etc) supply will result in the PV inverter shutting down instantaneously as a safety requirement and it takes the inverter about 3 minutes to start up again once all the grid requirements are met. In the UK its classed as G98 (single phase) and G99 (3 phase) regulations.

Some of the many reason's that these huge warehouses don't get covered in Solar panels are:

1/ large roof installations are more costlier than a large ground mount to install.

2/ These warehouses normally have only a grid connection that cover the needs of the warehouse which won't be much compared to say a manufacturing facility - therefore you can only install a PV system that will not exceed the sites incoming fuse/cable capability.

3/ Legal nightmare as the occupiers of the warehouses are rarely the owners of - therefore legal consents for renting of roof space etc etc

4/ No requirement in planning to install Solar PV - idiotic but hey that's Government policy for you!

I was involved in building a new off grid warehouse and manufacturing site in Cape Town. Energy demand wasn't so high. The solar also powered a bore hole water supply. At night the local grid provided power as needed.


JohnV6
2022 CX Plus Four
2025 Renault Scenic Alpine etech "Yvette"
Joined: Sep 2019
Posts: 360
Likes: 36
S
Learner Plates Off!
Offline
Learner Plates Off!
S
Joined: Sep 2019
Posts: 360
Likes: 36
Originally Posted by John V6

I was involved in building a new off grid warehouse and manufacturing site in Cape Town. Energy demand wasn't so high. The solar also powered a bore hole water supply. At night the local grid provided power as needed.

That's not a true off grid system - its just a standard grid connected system where the Solar PV output has been designed to match site load during daylight hours. If you turned the solar off then the grid would still supply the site as it does during the night.

Last edited by Stevo666; 21/09/22 05:51 AM. Reason: added info
IMHO #756152 21/09/22 06:58 AM
Joined: Apr 2014
Posts: 6,957
Likes: 116
Talk Morgan Sage
Offline
Talk Morgan Sage
Joined: Apr 2014
Posts: 6,957
Likes: 116
I have a 4Kw system with battery backup installed. Is there any point in renewing the battery when it reaches its end of life?


Best Regards
Lang may yer lum reek
IMHO #756178 21/09/22 11:20 AM
Joined: Jul 2007
Posts: 27,810
Likes: 749
Member of the Inner Circle
Offline
Member of the Inner Circle
Joined: Jul 2007
Posts: 27,810
Likes: 749
Bob,
I have a 3.9kW array installed & 4.2 kWh batteries on order now for nearly a year. They will we hope (4th time a date has been booked) be installed in early Novemeber 13 months after order. I reckon at 52p kWh the payback is 4.7 years. At the current 29p it is jusr over 8 years.

We generate an average of 11.7 kW per day over the last 4 years. We divert any excess now to heat our hot water first. From May to October we use little / no gas. this year it is 16 units so far (only gas rings on the cooker). We use in the same period 4kWh per day of electricity, so with batteries we would be off grid.

The batteries obviously deteriorate over time so I guess you need to consider if it is replace or supplement the stack. My installation can have 5 batteries on a stack and the 4.2 kWh is only 2 slots. When I last looked they were c£1k each battery.


JohnV6
2022 CX Plus Four
2025 Renault Scenic Alpine etech "Yvette"
IMHO #756185 21/09/22 12:56 PM
Joined: Apr 2014
Posts: 6,957
Likes: 116
Talk Morgan Sage
Offline
Talk Morgan Sage
Joined: Apr 2014
Posts: 6,957
Likes: 116
Thank you John. I had a power cut recently and there didn't seem to be any electricity available from the battery. Is this normal?


Best Regards
Lang may yer lum reek
IMHO #756190 21/09/22 02:53 PM
Joined: Jul 2007
Posts: 27,810
Likes: 749
Member of the Inner Circle
Offline
Member of the Inner Circle
Joined: Jul 2007
Posts: 27,810
Likes: 749
Yes. For safety reason the system shuts down. If the repair team are working on what they think is a dead power system in the area then you exporting power puts them at risk. You can get a single socket fitted to the batteries to use them as a UPS (uniteruptable power supply), but that was another £300 so I didn't buy it.


JohnV6
2022 CX Plus Four
2025 Renault Scenic Alpine etech "Yvette"
IMHO #756197 21/09/22 06:17 PM
Joined: Nov 2015
Posts: 8,672
Likes: 489
Just barreling along
Needs to Get Out More!
Offline
Just barreling along
Needs to Get Out More!
Joined: Nov 2015
Posts: 8,672
Likes: 489
Interesting stuff all this, keep it coming chaps thumbs


Jon M
Page 3 of 8 1 2 3 4 5 6 7 8

Moderated by  TalkMorgan 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5