Should be going into build this month sometime.
As soon as its ready i`m going to have to go for a long drive.
1st port of call, drive up to Telford and Malvern to get the 1st service done.
Then, when it gets warmer, down to Rye and Hastings.
Next, The Albert ball blat.
Then, maybe Grindalwald.
The car is built for export, so i only have 6 months in the UK.
Last edited by rockabilly john; 07/02/17 11:40 AM.