For my part, the work on the new engine Started, I make tools to implement the crankshaft bearings and make a carrier oil filter accepting probe oil temperature and pressure over the probe of original oil alert, I have had some time against her last week and so far has not pressed I have more important things to do right now, when the last oil change I the filter mounted on the carrier for the two tw ramp caps lubricating the engine block are removable






the last photo plugs oil circuit need more dremel drill to extract because they are sticking and overtighten

I just hope the 132 cub is finished before the hill climbing rue Lepic Paris be organized the next mayor of Paris.