Very interesting, it is noticeable that every time I go on a factory tour, another area has been freed up to increase capacity eg I presume the final quality control area had been moved out of the trim shop. Be interesting to understand which areas form the pinch points as production ramps up, currently it could be trim, the next pinch point could be eg wood frame production and then the resultant lead times to ramp up the staff with the requisite skills in those areas.

We noticed for the first time the message/control board in the chassis assembly area in December showing the progress , responsible person and remaining time left on the build on each chassis...