Jim, thanks for the heads up..... I'm working on the basis that the ash frame will not be changed as per 5.6.2.1. Only the plywood in-fill on the floor and back deck are swapped as per 5.6.1.8 the regs I agree prohibit the removal of any parts of the frame itself.