Originally Posted by AKD
Just had an update from my dealer who says it is taking 2 mechanics 1.5 days per CX Model to rectify.
So I guess the 3 month warranty extension may not ultimately be signed with how long this is going to take to be brought to a conclusion.


Mine took 1 man about a day and I had a little TLC done at the same time. That said, one stud on the master cylinder would not undo (too much loctite applied from new by the factory) so it had to be drilled out. Added 40 mins to the time.